Product image 1
Product image 2
Product image 3
Product image 4
Product image 5
HomeStore

Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Youth - Gray

Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Youth - Gray

The all-new Flowline Helmet is hand-picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, safety and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

  • 3-Way adjustable screwless visor
  • NTA-8776 certified for E-Bike usage
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment
  • 14 vents for maximum airflow
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Side strap adjusters
  • 5-Star Virginia Tech safety rating


$59.99
Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Youth - Gray
$59.99

Product Information

Shipping & Returns

Description

The all-new Flowline Helmet is hand-picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, safety and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

  • 3-Way adjustable screwless visor
  • NTA-8776 certified for E-Bike usage
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment
  • 14 vents for maximum airflow
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Side strap adjusters
  • 5-Star Virginia Tech safety rating


Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Youth - Gray | Cambria Bike