Product image 1
Product image 2
Product image 3
Product image 4
Product image 5
Product image 6
Product image 7
Product image 8
Product image 9
HomeStore

Troy Lee Designs Flowline Superlyte MTB Short - Timber

Troy Lee Designs Flowline Superlyte MTB Short - Timber

Troy Lee Designs Flowline Superlyte MTB Short

Casual comfort meets trail-ready performance with the Flowline Superlyte MTB Short. Designed for all-day wear, this lightweight, breathable, and moisture-wicking short is perfect for both town and trail. Featuring 4-way stretch recycled fabric, a premium jacquard elastic waistband, and Bluesign®-approved materials, the Flowline Superlyte is built for comfort, sustainability, and performance.

Key Features

  • Lightweight & Breathable – Made from 89% recycled polyester and 11% spandex for unrestricted movement.
  • 4-Way Stretch Fabric – Moves with you for ultimate flexibility on and off the bike.
  • Moisture-Wicking & Quick-Dry Interior – Keeps you cool and dry during long rides.
  • Bluesign® Approved Materials – Environmentally friendly, sustainable fabric construction.
  • Premium Jacquard Elastic Waistband – Provides a secure and comfortable fit.
  • Mid-Knee Length (20 ¾" Outseam) – Ideal coverage for pedaling efficiency and casual style.
  • Functional Pockets – Two front pockets with bonded interiors for durability, plus a secure side pocket for your phone or essentials.
  • Locking YKK Zipper with Snaps – Secure and durable closure system.

Whether you're ripping through trails or cruising around town, the Flowline Superlyte MTB Short delivers effortless style, comfort, and performance.

Select Color
Select Size
From $31.50

Original: $105.00

-70%
Troy Lee Designs Flowline Superlyte MTB Short - Timber

$105.00

$31.50

Product Information

Shipping & Returns

Description

Troy Lee Designs Flowline Superlyte MTB Short

Casual comfort meets trail-ready performance with the Flowline Superlyte MTB Short. Designed for all-day wear, this lightweight, breathable, and moisture-wicking short is perfect for both town and trail. Featuring 4-way stretch recycled fabric, a premium jacquard elastic waistband, and Bluesign®-approved materials, the Flowline Superlyte is built for comfort, sustainability, and performance.

Key Features

  • Lightweight & Breathable – Made from 89% recycled polyester and 11% spandex for unrestricted movement.
  • 4-Way Stretch Fabric – Moves with you for ultimate flexibility on and off the bike.
  • Moisture-Wicking & Quick-Dry Interior – Keeps you cool and dry during long rides.
  • Bluesign® Approved Materials – Environmentally friendly, sustainable fabric construction.
  • Premium Jacquard Elastic Waistband – Provides a secure and comfortable fit.
  • Mid-Knee Length (20 ¾" Outseam) – Ideal coverage for pedaling efficiency and casual style.
  • Functional Pockets – Two front pockets with bonded interiors for durability, plus a secure side pocket for your phone or essentials.
  • Locking YKK Zipper with Snaps – Secure and durable closure system.

Whether you're ripping through trails or cruising around town, the Flowline Superlyte MTB Short delivers effortless style, comfort, and performance.